For Glazed Panel Production
Auto balance valve, maintains even movement of top platten, copyright applied.
Built in pressure relief (factory set at glue manufacturers recommendations).
Auto check valve maintains load within 10% of initial pressure throughout closed time (note) when pressing glazed units it is not recommended to "top up" pressure during curing time as breakages of sealed unit is possible.Roll in roll out facility, allowing panel stack to be built outside the confines of the press. Holds up to 15 panels.
Designed to exert 6 - 9 lb per square inch over 2100 x 900 area as per glue manufacturers recommendations.
Guarding Conforms to HSE recommendations on speed of unguared presses.
NOTE - THE HEAVY DUTY PRESS IS ONLY SUITABLE FOR CLOSED CELL INFILLS.
IMPORTANT - please inform before placing of order if open cell infills are to be used as dual pressure pump would have to be fitted.
FINISH In two tone grey.


The panel stack is built up outside the press on the rolling infeed provided. The stack is then transferred into the press and the press closed.
Normally the open time is 30 minutes at 17 degree centigrade giving a closed time of 90 minutes. For continuous production a minimum of three presses are required.